Assessment of potential and offshore wind power development of Vietnam and recommendations to Petrovietnam
Abstract
With a coastline of over 3.200 km and a water area of about 1 million km2, Vietnam is considered a country with great offshore wind potential, especially offshore wind energy. However, offshore wind power is a relatively new field in Vietnam. The research works in this field have, up to now, mainly forcused on potential assessments. There are limited in-depth technical studies and studies on the offshore wind supply chain and assessment of the ability of Vietnam businesses to participate. As a core and key unit of the energy industry, the Vietnam Oil and Gas Group (Petrovietnam) has much experience and advantages in implementing projects on the sea area. Petrovietnam can completely master specialized fields in the offshore wind power development chain such as: geological/geotechnical and geophysical survey, installation of submarine cables, design and installation of steel structures, equipment transportation, etc. In order to take this opportunity, Petrovietnam has been building and preparing the necessary conditions to be ready to participate as an investmentor as well as to provide services in the supply chain of offshore wind power in Vietnam.
This study has evaluated the roadmap for developing offshore wind power in Vietnam inline with the national plans, aiming for the target that offshore wind capacity would increase from the current level of 0 to 6GW by 2030 and a vision of 70 - 91.5 GW by 2050. Results of assessing technology trends, costs, and supply chain potential for offshore wind power in Vietnam show that PVN's subsidiaries have strengths in services such as: analysis services, geological, geophysical oceanographic surveys and environmental impact assessment; design and fabrication services for offshore substations and turbine foundations; turbine installation services, turbine foundations, substations, offshore underground cable laying; O&M services; decommissioning services such as: abandoning offshore structures and underground cable systems. Based on the results of analyzing the potential and opportunities for developing offshore wind power in Vietnam, this study also proposes some recommendations for Petrovietnam and relavant agencies in the short and long term.
References
GWEC Market Intelligence, "Báo cáo Dữ liệu về nguồn cung cấp gió toàn cầu", 2021.
Bộ Công Thương, “Quy định về nội dung, trình tự, thủ tục lập, thẩm định và phê duyệt quy hoạch phát triển điện gió”, Thông tư số 06/2013/TT-BCT, ngày 8/3/2013.
Douglas Arent, Patrick Sullivan, Donna Heimiller, Jake Badger, Hans Ejsing Jørgensen, Mark Kelly, Leon Clarke, and Patrick Luckow, "Improved offshore wind resource assessment in global climate stabilization scenarios", National Renewable Energy Laboratory, 2012.
Bộ Tài nguyên và Môi trường, "Đường mép nước biển trung bình thấp nhất nhiều năm”, 1/6/2020. [Online]. Available: http://www.monre.gov.vn/Pages/xac-dinh-duong-mep-nuoc-bien-thap-nhat-trung-binh-nhieu-nam.aspx.
Thủ tướng Chính phủ, "Phê duyệt quy hoạch phát triển điện lực quốc gia thời kỳ 2021 - 2030, tầm nhìn đến năm 2050", Quyết định số 500/QĐ-TTg, 15/5/2023.
1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.