Solutions to handle wellbore instability in Vietsovpetro
Abstract
This paper analyses the causes of wellbore instability from the process of drilling 250 wells on offshore fields of Vietsovpetro (with different trajectory, drilling muds and deviation). On that basis, the author proposes solutions to handle the condition of wellbore instability, e.g. reaming and back reaming with high-viscosity sweep, mud condition, increasing of mud weight in allowable mud weight window. The research also shows the appraisal of drilling method’s influence on the duration of wellbore stability helps reduce well problems and accidents during the drilling process.
References
2. Vietsovpetro. Các tài liệu tổng kết phức tạp sự cố trong quá trình thi công giếng khoan tại Liên doanh Việt - Nga “Vietsovpetro” giai đoạn 2010 - 2017.
3. Vietsovpetro. Báo cáo khoan tại Liên doanh Việt - Nga “Vietsovpetro” giai đoạn 2010 - 2017.
4. Borivoje Pašić, Nediljka Gaurina-Međimurec, Davorin Matanović.Wellbore instability: causes and
consequences. Rudarsko-geološko-naftni zbornik. 2007; 19(1): p. 87 - 98.
5. В.С.Войтенко. Управление горным давлением при бурении скважин. Москва: Недра. 1985.
1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.